All nuclear power units operating at full capacity - Energoatom

All nuclear power units operating at full capacity - Energoatom

Ukrinform
As of March 2, all nuclear power units located in Ukraine-controlled territory are operating at full capacity.

National Nuclear Energy Generating Company Energoatom said this in a statement published on Telegram, Ukrinform reports.  

"On March 2, all nine units of domestic nuclear power plants located in the government-controlled territory are operating at the full available capacity. Electricity is smoothly supplied to Ukrainians, and it is enough to meet the needs of consumers," the report says.

Read also: Ukraine may resume electricity exports soon – Ukrenergo

As reported, as of March 2, there has been an increase in available capacity in the Ukrainian power system, which rises its operational security and reduces the risks of deficit. Consumption is covered by Ukrainian generation and minor imports.

While citing and using any materials on the Internet, links to the website ukrinform.net not lower than the first paragraph are mandatory. In addition, citing the translated materials of foreign media outlets is possible only if there is a link to the website ukrinform.net and the website of a foreign media outlet. Materials marked as "Advertisement" or with a disclaimer reading "The material has been posted in accordance with Part 3 of Article 9 of the Law of Ukraine "On Advertising" No. 270/96-VR of July 3, 1996 and the Law of Ukraine "On the Media" No. 2849-Х of March 31, 2023 and on the basis of an agreement/invoice.

© 2015-2024 Ukrinform. All rights reserved.

Extended searchHide extended search
By period:
-