On Saturday, Ukraine plans to attract help from power systems of Romania, Slovakia, Poland and Hungary

On Saturday, Ukraine plans to attract help from power systems of Romania, Slovakia, Poland and Hungary

Ukrinform
On Saturday, 20 July, it is planned to import electricity from Romania, Slovakia, Poland and Hungary with a maximum capacity of 1,385 MW.

According to Ukrinform, this was reported by the Ministry of Energy of Ukraine.

The situation in the energy sector remains difficult. There is a significant shortage of generating capacity in the system due to massive Russian attacks since the spring of this year, and shelling continues, especially in the frontline areas. Substations and power transmission lines are often targeted.

Yesterday, Ukraine's power system received surplus electricity from the Polish power system.

Read also: European leaders reaffirm support for Ukraine's energy sector at summit in UK

On Saturday, hourly blackout schedules are scheduled to run from 06:00 to 24:00. The blackouts are not foreseen for critical infrastructure enterprises and companies that import more than 80% of electricity for their needs in accordance with a government decree.

The ministry reminded that the main reason for the electricity supply restrictions is the enemy's attacks on the energy infrastructure and the negative consequences of these attacks. 9 GW of generating capacity was lost.

In Poltava region, equipment at a high-voltage substation was switched off during an air raid alarm, which led to a blackout of several overhead lines, substations and household consumers. A fire broke out at the substation. The fire has been extinguished. Consumers are partially supplied with electricity via a backup scheme.

A fire broke out at a high-voltage substation in Sumy Oblast during an attack by unmanned aerial vehicles, which led to a shutdown of equipment and a loss of the substation's own needs. The fire was extinguished.

In Chernihiv region, a UAV attack shut down equipment at a high-voltage substation. Several substations, household consumers and a company were cut off from power. The inspection revealed a fire at the substation. The fire was extinguished. Consumers are partially supplied with power.

In Kharkiv region, a high-voltage overhead line was disconnected as a result of hostilities. Consumers were not cut off.

In Donetsk Oblast, ventilation equipment stopped working at a mine. At the time, there were 33 workers in the mine, all of whom were brought to the surface.

Read also: Russians attack Dniprovskyi district of Kherson, one injured

Power companies supplied power to 16,102 consumers who were cut off from electricity as a result of the hostilities. In total, 541 settlements remain without power due to the hostilities and technical violations.

At Zaporizhzhia NPP, the water level in the cooling pond is 14.89 metres. This is enough to meet the needs of the plant.

As Ukrinform reported, a hotline on energy issues has been launched in Ukraine.

While citing and using any materials on the Internet, links to the website ukrinform.net not lower than the first paragraph are mandatory. In addition, citing the translated materials of foreign media outlets is possible only if there is a link to the website ukrinform.net and the website of a foreign media outlet. Materials marked as "Advertisement" or with a disclaimer reading "The material has been posted in accordance with Part 3 of Article 9 of the Law of Ukraine "On Advertising" No. 270/96-VR of July 3, 1996 and the Law of Ukraine "On the Media" No. 2849-Х of March 31, 2023 and on the basis of an agreement/invoice.

© 2015-2024 Ukrinform. All rights reserved.

Extended searchHide extended search
By period:
-